Browse by Job:

[google-translator]

Case Study: Permeation of GRE Isolation Gasket

An operator of an established Oil field in the UAE approached GPT after encountering the same persistent problem with its flange isolation gaskets (kit) at two sites. Two to three years after the installation of an isolation gasket that was recommended by an engineering consultant, the flanges began to leak. On closer inspection, this was a unique incident. It was found that the conventional GRE (Glass Reinforced Epoxy) flange isolation kit (FIK) installed was not compatible with the application.

下载文件

英文版
下载

我们随时准备好协助您!

通过我们的网络,您可随时联系我们的销售团队、制造团队或分销伙伴,我们期待您的反馈。如果您有任何问题,都请随时联系我们,我们将全力帮助您。

联系我们
chevron-down