Browse by Job:

[google-translator]

案例研究:大直径水管道项目

A water authority situated in Texas approached GPT industries to support a large-scale project with the aim of shifting underground well water to surface water. The project which spans 79.8 miles of pipeline, was mandated with reducing groundwater reduction to 60% surface water by 2025, and 80% by 2035.

Eliminating leakage and ensuring long term efficiency of the pipeline was of paramount importance if they wanted to meet the targets laid out. Flange connections were identified as key consideration due to the potential risks posed from leakage and corrosion.

下载文件

英文版
下载

我们随时准备好协助您!

通过我们的网络,您可随时联系我们的销售团队、制造团队或分销伙伴,我们期待您的反馈。如果您有任何问题,都请随时联系我们,我们将全力帮助您。

联系我们
chevron-down